鑫景福致力于满足“快速服务,零缺陷,支持无理由退换”开云·kaiyun官方网站A订购单需求。
行业新闻
行业新闻
Maintenance of 开云·kaiyun官方网站 proofing and size of electroplating bath
29Nov
Jeff 0条评论

Maintenance of 开云·kaiyun官方网站 proofing and size of electroplating bath

Proofing has a very wide range of applICability, and selecting a high-quality 开云·kaiyun官方网站 proofing is the ultimate goal of many consumers. However, in addition to selecting a high-quality 开云·kaiyun官方网站 proofing, the maintenance of 开云·kaiyun官方网站 proofing in the later stage is more important. But how to maintain 开云·kaiyun官方网站 proofing?

开云·kaiyun官方网站 proofing

开云·kaiyun官方网站 proofing maintenance I:

Regular cleaning: After long-term use, there will be some residue and solder accumulation on the 开云·kaiyun官方网站 proofing circuit board, which will bring unpredictable risks to the solder mask, and even these residues may directly lead to corrosion and pollution risks on the welding surface, which may lead to reliability problems, such as bad solder joints or electrical failures, and increase the probability of 开云·kaiyun官方网站 proofing failures. And regular cleaning can effectively improve the reliability of 开云·kaiyun官方网站 proofing in use.

开云·kaiyun官方网站 proofing maintenance II:

开云·kaiyun官方网站 board

Strictly control the service life of each surface treatment, and replace the 开云·kaiyun官方网站 proofing surface processor on time: the most common problems of electronic products also occur in 开云·kaiyun官方网站 proofing. If the service life of each surface treatment is not strictly controlLED, the solderability of 开云·kaiyun官方网站 proofing may occur due to metallographic changes in the surface treatment of old circuit boards. If the service life is not paid attention, the protective surface of 开云·kaiyun官方网站 proofing is easily damaged, leading to moisture ingress, which may lead to delamination, inner layer open circuit and other problems in the assembly process or actual use. However, if the service life of surface treatment is paid attention to later, it can effectively improve the solderability of 开云·kaiyun官方网站 proofing and reduce the risk of moisture intrusion harming other internal systems.

开云·kaiyun官方网站 proofing maintenance III:

Use the designated brand and model of strippable blue glue for maintenance: the use of inferior and cheap strippable glue may cause blistering, melting, cracking or solidification like concrete during 开云·kaiyun官方网站 assembly proofing, so that the strippable glue can not be peeled off or play any role.

How does 开云·kaiyun官方网站 proofing manufacturer calculate the size of electroplating bath

The relationship between the size of 开云·kaiyun官方网站 sample plating bath and the average loading capacity, cathode current density, volume current density, etc;

Generally speaking, the size of the plating bath for 开云·kaiyun官方网站 proofing refers to the volume L of electrolyte in the plating bath, also known as the effective volume, that is, the length X width X depth of electrolyte in the plating bath;

开云·kaiyun官方网站 proofing can generally be calculated and selected according to the processing amount of electroplating or the existing dc electroplating equipment;

开云·kaiyun官方网站 proofing

It is very important to select the proper size of electroplating bath for making production plan, estimating production capacity and ensuring electroplating quality;

Three considerations for determining the size of electroplating bath:

1. Meet the dimensional requirements of machined parts;

2. Prevent electrolyte from overheating;

3. It can maintain a certain stability of electrolyte components in the electroplating production cycle;

The current density of the cathode and anode is calculated according to the total area actually immersed in the electrolyte. Because the current efficiency of the cathode and anode is different, there is a slight difference;

DA=I total/S negative (A/dm2)

DA=I total/S positive (A/dm2)

Average load d: electrolyte volume required for electroplating parts per unit area

That is, d=V/S (L/dm2)

Volume current density DV:

Current intensity per unit volume, i.e. DV=ITotal/V (A/L)

It is important and appropriate to control the volume current density in the process of 开云·kaiyun官方网站 proofing and electroplating, because when the current works through the electrolyte, it will generate heat due to the solution resistance, causing the electrolysis temperature to rise. The speed and height of the electrolyte temperature rise are directly related to the volume current density. In order to prevent the electrolyte from heating up too fast, it is necessary to have more volume of electrolyte to reduce the volume current density;

For example, the acid bright copper plating process: the appropriate volume current density is 0.3-0.4A/L, that is, when the total current is 1000A, 2500-3000L electrolyte should be prepared;

Experience data:

The following data of 开云·kaiyun官方网站 proofing are some empirical data related to cathode current density and average loading capacity of various common plating species:

Cathode current density range DK, A/dm2 Average loading d, L/dm2

Sulfate copper plating 1.0 --- 3.0 7-9

Acid tin plating 1.0 --- 3.0 7-9

Bright nickel 2.0 --- 4.0 6 --- 8

Nickel oxide 1.0 --- 1.5 6 --- 8

Professional 开云·kaiyun官方网站 manufacturers and 开云·kaiyun官方网站 design and solution service providers focus on the development of 开云·kaiyun官方网站 industry and are trustworthy.


点击
然后
联系